132/33kV Grid Transformers Replacement<br/><span class="design1">(Project Development, FEED & Detailed Design)</span>
End User Scottish and Southern Electricity Networks Project Title Replacement of 132/33kV Grid Transformers A1MT, A2MTA, A2MTB at 132/33kV Havant Substation Year 2019/20 Project Scope Replacement of existing 132/33kV 90MVA and 45MVA transformers in stages. The design scope covers Stage 1 concept design to develop a high-level P&C concept as defined in the Technical Report […]
33kV Network Reinforcement<br/><span class="design1">(Project Development, FEED & Detailed Design)</span>
End User Scottish and Southern Electricity Networks Project Title 33kV network reinforcement between Ascot , Bracknell and MVEE substations Year 2019/20 Project Scope Installation of new 6 panel 33kV indoor switchboard at Ascot substation and to establish 2 new 33kV cable circuits to MVEE substation and remote end protection modifications at Bracknell, Sunninghill and Chobham […]
400kV Switchgear Refurbishment<br/><span class="design1">(Design Review and Technical Assurance)</span>
End User National Grid plc Project Title Lot 3 – Switchgear Replacement Year 2017 Project Scope Replacement of old Conventional Air Blast (CAB) Circuit Breakers from 132kV up to 400kV that were installed back in 1960’s that has reached their useful asset life or have failed the condition assessment. The project site involves 10 substations […]
Review of Existing 33kV Protection Settings<br/><span class="design1">(Specialist Studies)</span>
End User Scottish and Southern Electricity Networks Project Title Protection Task Force – Review of existing 33kV protection settings for the South network Year 2019 Project Scope Review of existing 33kV protection settings and grading studies involving SSEN South of England distribution network for Burghfield and Thatcham regions. Our Scope Undertake manual settings calculations in […]
Rechargeable Customer Connections<br/><span class="design1">(Project Development, FEED & Detailed Design)</span>
End User Scottish and Southern Electricity Networks Project Title Rechargeable Customer Connections (from 11kV to 132kV) Year 2016/18 Project Scope Renewable energy projects involving PV Solar, Battery Storage, AC Generators and Customer connections involving Data Centers in the South East of England. Our Scope Provide technical support for new connection enquiries from application right to […]
11kV Switchgear Replacement<br/><span class="design1">(Project Development, FEED & Detailed Design)</span>
End User Scottish and Southern Electricity Networks Project Title Switchgear Replacements Year 2015/16 Project Scope Replacement of indoor 11kV and outdoor 33kV switchgears for various sites as part of SSEN major project investments. Our Scope The protection scope involves design for new 11kV and 33kV protection system and wiring modifications on the existing Transformer protection […]
132kV Asset Replacement<br/><span class="design1">(Detailed Design and Construction Design Support)</span>
End User Scottish and Southern Electricity Networks Project Title 132kV Switchgear Replacement Year 2019/20 Project Scope Replacement of existing 132kV line and transformer disconnectors and associated 132kV high-level conductors and associated drop wires, jump wires, insulators and connectors at Rownham substation and replacement of existing 132kV CT’s and VT’s at Nursling substation. Our Scope Production […]
ENA Application and Grid Connection<br/><span class="design1">(Pre-development And Feasibility Studies)</span>
End User Low Carbon (Renewable Energy Developers ) Project Title ENA Application and Connection Feasibility Year 2015/17 Project Scope The projects mainly covers solar photovoltaic (PV), battery storage and generators between 10MW to 50MW from 33kV to 132kV connections on to hosting DNO network e.g. SSE, UKPN, WPD, NPG, SPEN. Our Scope Front-end design services […]
Review Connections Offer and Cost Analysis<br/><span class="design1">(Technical advisory)</span>
End User Low Carbon (Renewable Energy Developers) Project Title Review Connections Offer and Cost Analysis Year 2015/17 Project Scope The projects mainly covers solar photovoltaic (PV), battery storage and generators between 10MW to 50MW from 33kV to 132kV connections on to DNO network e.g. SSE, UKPN, WPD, NPG, SPEN. Our Scope Review the connection offers […]
G59 Commissioning<br/><span class="design1">(Independent Audits And Inspection)</span>
End User ib vogt GmbH Project Title G59 commissioning audit Year 2015/17 Project Scope Commissioning audit of solar PV farms (from 5MW to 50MW plants) in the South of England, South Wales and Wales. Our Scope Site inspection audit of plant installation and commissioning status Witnessing G59 testing and protection compliance checks as an independent […]