End User
Vinci Energies, Greece
Project Title
150kV Cable Derating Studies (Specialist Studies)
Year
2021
Project Scope
The client has constructed boreholes for two 150kV 800 mmsq cable circuit using Horizontal Directional Drilling (HDD). However, there is a section where the boreholes were coming too close and that it could impact the current capacity of the circuit. Hence the client wanted to undertake a cable de-rating studies.
Our Scope
- Perform de-rating studies of the cable and model the cable circuit
- Calculate the sustained current capacity
- Prepare a technical report and provide engineering recommendations