Cambodia: 230kV Kampong Cham – Kratie Transmission System Project​<br/><span class="design1">(Lenders Engineer)</span>​

End User Electricite Du Cambodge (EDC), Cambodia Project Title 230kV Kampong Cham – Kratie  Transmission System Project Year 2017/18 Project Scope Construction two new 230/115/22kV substations namely Kratie and Kampong Cham connected by an approximately 98km double circuit 230kV transmission line linking these substations. Our Scope Provide services as Independent Engineer (IE) to review and […]

Malaysia: 132/33kV Sungai Mati Transformer Replacement Scheme<br/><span class="design1">(Design Review and Technical Assurance)​</span>

End User Tenaga Nasional Berhad (TNB) Malaysia Project Title 132/33kV Sungai Mati Transformer Replacement Scheme Year 2015 Project Scope Supply, erect and commissioning of 2 new 132kV Transformer bays, 132/33kV 90MVA  Transformers, ancillary equipment and associated civil works for the replacement of 45MVA existing transformers Our Scope Site survey, preparation of technical specifications, cost estimates, […]

Singapore: Transformer Independent Review<br/><span class="design1">(Specialist Review)​</span>

End User Bureau Veritas Project Title Transformer Independent Review Year 2015 Project Scope The end client Singapore Power Grid Ltd had a dispute with their main contractor on supply of 230/66/22kV 200MVA Power Transformer Our Scope Provide an independent review on 230/66/22kV 200MVA Power Transformer technical specifications and factory acceptance test reports. Identify any ambiguous […]

Kenya: Consultancy Services For The Project Management And Supervision Of The Lamu-Kitui-Nairobi East 520km Double Circuit 400kV Transmission Lines And Substations​<br/><span class="design1">(Owners Engineer)</span>​

End User Kenya Electricity Transmission Company (KETRACO) Project Title Consultancy Services for the Project Management and Supervision of the Lamu-Kitui-Nairobi East (520 km) and Dongo Kundu – Mariakani (50 km) Double Circuit 400 kV Transmission Lines and Substations Year 2014 Project Scope The Government of Kenya plans to add more than 5000 MW of generation […]

Review of Existing 33kV Protection Settings<br/><span class="design1">(Specialist Studies)</span>

End User Scottish and Southern Electricity Networks Project Title Protection Task Force – Review of existing 33kV protection settings for the South network Year 2019 Project Scope Review of existing 33kV protection settings and grading studies involving SSEN South of England distribution network for Burghfield and Thatcham regions. Our Scope Undertake manual settings calculations in […]

Rechargeable Customer Connections<br/><span class="design1">(Project Development, FEED & Detailed Design)</span>

End User Scottish and Southern Electricity Networks Project Title Rechargeable Customer Connections (from 11kV to 132kV) Year 2016/18 Project Scope Renewable energy projects involving PV Solar, Battery Storage, AC Generators and Customer connections involving Data Centers in the South East of England. Our Scope Provide technical support for new connection enquiries from application right to […]